T.D. Craft Grading completed the civil site development for Livingston Park, a 134-lot residential subdivision spanning approximately 65 acres in Easley. The multi-phase project included major earthwork, roadway construction, lot preparation, storm drainage, and three stormwater-management ponds. A key component was rerouting an existing 18-inch sanitary-sewer main that crossed through the middle of the planned development.
Work Performed
- Clearing, grubbing, and large-scale site preparation
- Mass grading across three phases
- Preparation of 134 residential lots
- Subdivision roadway and cul-de-sac construction
- Road subgrade, stone-base, curb, and paving preparation
- Rerouting of the existing 18-inch sanitary-sewer main
- Sewer protection and utility coordination
- Storm-drainage pipe and structure installation
- Construction of three stormwater-management ponds
- Drainage swales, riprap spillways, and energy dissipation
- Erosion control around creeks, wetlands, and floodplain areas
- Fine grading and final stabilization