Lake Keowee Water Treatment Plant – Phase 1

T.D. Craft Grading performed major civil earthwork and site preparation for Phase 1 of the Lake Keowee water-treatment infrastructure project. The work was completed on steep lakeside terrain with substantial elevation changes, limited access, and strict shoreline-buffer requirements.

Work Performed / Project Scope

  • Clearing and large-scale earthwork
  • Excavation and embankment construction
  • Raw-water pump-station grading
  • Intake-piping corridor preparation
  • Pre-sedimentation-basin preparation
  • Membrane-treatment-building grading
  • Administration-building pad preparation
  • Electrical-room and transformer-pad grading
  • Bulk chemical-storage-area preparation
  • Mixing-basin excavation
  • Access-drive construction and grading
  • Retaining-wall excavation and preparation
  • Construction of steep cut-and-fill slopes
  • Coordination around process piping and infrastructure
  • Drainage-ditch construction
  • Rock-check-dam and erosion-control installation
  • Protection of shoreline setbacks and buffers
  • Final slope stabilization and restoration