Water Control Measures | Grey Court, South Carolina

There is no project to big or to small for TD Grading. This 5 Acre project in Grey Court, South Carolina was pretty straight forward. We installed some simple, yet effective low cost water control measures to control any water that found it’s way onsite.

After leveling a large parking area, we spread several truck loads of stone for highway truck parking. Next step was access, which was achieved by adding stone ramps for truck and equipment access to the top of the property.

Water Control Measures Project Details

Scope of work: water/sewer, storm drainage, small dirt moving, fine grading, erosion control, final stabilization of site, Rebuild Rd.

  • Over 5,000 CY of dirt was mostly exported
  • More than 80 foot of 15in. RCP
  • We also cleared 2 Acres of trees

The Tools for the project:

  • One – 360 machine with hydraulic thumb
  • One – 51 GPS dozer
  • Our trusted Roller, Skid steer, Mini Track hoe

The team at TD Craft Grading enjoys working on many different types of projects. Be sure to check out some of our other project spotlights. We would love to have your project be our next one.