T.D. Craft Grading completed the civil site development for a FedEx truck and trailer parking facility on Bruce Road in Greenville. The approximately 15-acre property was developed for secure heavy-duty parking and truck circulation, with roughly eight acres disturbed. The work required coordination around an existing creek, wetlands, floodplain limits, and the active FedEx facility.
Work Performed
- Clearing, demolition, and site preparation
- Mass grading and heavy-duty parking preparation
- Truck and trailer parking-area construction
- Internal truck circulation lanes
- Heavy-duty asphalt and concrete preparation
- Site-access and gated-entry preparation
- Detention-pond and bioretention-area construction
- Storm-drainage pipe and outlet installation
- Replacement of approximately 320 feet of 72-inch drainage pipe
- Temporary creek-crossing construction and removal
- Wetland and floodplain protection
- Final grading and site restoration