Livingston Park Subdivision – Easley, SC

T.D. Craft Grading completed the civil site development for Livingston Park, a 134-lot residential subdivision spanning approximately 65 acres in Easley. The multi-phase project included major earthwork, roadway construction, lot preparation, storm drainage, and three stormwater-management ponds. A key component was rerouting an existing 18-inch sanitary-sewer main that crossed through the middle of the planned development.

Work Performed

  • Clearing, grubbing, and large-scale site preparation
  • Mass grading across three phases
  • Preparation of 134 residential lots
  • Subdivision roadway and cul-de-sac construction
  • Road subgrade, stone-base, curb, and paving preparation
  • Rerouting of the existing 18-inch sanitary-sewer main
  • Sewer protection and utility coordination
  • Storm-drainage pipe and structure installation
  • Construction of three stormwater-management ponds
  • Drainage swales, riprap spillways, and energy dissipation
  • Erosion control around creeks, wetlands, and floodplain areas
  • Fine grading and final stabilization