T.D. Craft Grading completed a deep storm-drain replacement within the T.L. Hanna High School athletic complex. The work was performed inside the existing track-and-field facility and required controlled excavation, trench protection, dewatering, and careful coordination around existing drainage structures and athletic improvements.
Work Performed
- Construction layout within the athletic complex
- Removal of the existing 30-inch RCP storm line
- Deep trench excavation
- Temporary dewatering and bypass pumping
- Trench-box placement and relocation
- Export and disposal of excavated material
- Installation of the replacement 30-inch storm pipe
- Controlled handwork around existing junction boxes
- Adjustment of existing storm structures and covers
- Installation of #57 stone bedding
- Full stone trench backfill and compaction
- Final grading and stabilization
- Protection of the surrounding track and athletic facilities